Manual Instalacion Malla Ciclonica Pdf Official
Place posts in the holes, fill with concrete, and use a level to ensure they are perfectly vertical. Let them cure for 24–48 hours before adding tension.
: Use aluminum or galvanized tie wires to fasten the mesh to the top rail and the line posts every 30 to 60 cm . manual instalacion malla ciclonica pdf
El calibre varía según el uso (calibre 12 para residencial, calibre 9 para industrial). Postes: Postes de arranque (esquineros) y postes de línea. Place posts in the holes, fill with concrete,
